Everybody loves an update.
I have got 5 of 7 cyclinders back from the shop, cleaned, inspected and resealed where neccessary.
I also have the valve block from the shop.
In the mean time I managed to get some time to improve the hydraulic oil tank in 3 minor ways
1. A boss for a magnetic sump stud. Although I can't see how metal will get into the tank if the filter is working properly on the return.
2. a sight level and thermometer.
3. a valve on the Pump suction line so that I can isloate the pump without losing a tank worth of oil.
Measure and mark
	
		
			
		
		
	
View attachment 121304
	
		
			
		
		
	
Nuts in place
	
		
			
		
		
	
View attachment 121306
	
		
			
		
		
	
Everything welded up.
	
		
			
		
		
	
View attachment 121305
	
		
			
		
		
	
Typically, the job was small, but there was some yak shaving to get there, building a welding trolley,  buying a new weldng mask, a saga with gas bottles and regulators, a workshop rewire and a misadventure into chinese mini excavator attachments, which are so cheap but also too small for my KMS180.
With the weather heading for a short period of positive temperatures, theres is a chance to clean all the lines and get the cylinders I have fitted while waiting on the leg cylinders.