Hello all,
I have a 40 metre driveway to cut from my barn to the road gate with a couple of off shoots for the field and another gate.
The ground is clay with a couple inches topsoil.
I was hoping for advice on the best way to level it before i lay in the stones (looking at small stone driveway of what ever colour stone my lovely wife decides on.
I have a small B1400 so was wondering if it is worth getting a grading blade or box grader....which would be better? To do the job.
Any advice is appreciated and the picture below may give an idea of the ground that needs cutting....(i tried to post a couple that show it all but for some reason i can only post one).
I have a 40 metre driveway to cut from my barn to the road gate with a couple of off shoots for the field and another gate.
The ground is clay with a couple inches topsoil.
I was hoping for advice on the best way to level it before i lay in the stones (looking at small stone driveway of what ever colour stone my lovely wife decides on.
I have a small B1400 so was wondering if it is worth getting a grading blade or box grader....which would be better? To do the job.
Any advice is appreciated and the picture below may give an idea of the ground that needs cutting....(i tried to post a couple that show it all but for some reason i can only post one).