Liked the guards on the M59. Protects against rocks and inadvertent bucket strikes. Added steps that really helped climbing up and down.
M59 outrigger
Used 5” x 17” long square tubing cutting in half long ways.
1.5” and 2” flatbar for slides.
One of four steps.
Cylinder perches that will be welded to the cylinders. The slide bars will go thru these.
Don’t need to be this heavy gauge steel necessarily but using material on hand. Work in progress.