AGMartin Apr 29, 2022 My 2021 L2501 was delivered on September 17, 2021 with only the FEL. After waiting 6 months and two weeks for the backhoe sub-frame, my Kubota Dealer dropped it off today with the backhoe installed.
My 2021 L2501 was delivered on September 17, 2021 with only the FEL. After waiting 6 months and two weeks for the backhoe sub-frame, my Kubota Dealer dropped it off today with the backhoe installed.