Three point internal parts coming tomorrow

kbrothers

Member

Equipment
b2150 HST loader/hoe
Dec 1, 2013
84
1
6
75
Ebensburg,Pa
Got E-Mail Messicks is shipping my 2150 parts Am replacing the arm and set pin that moves the three point arms. Got the necessary gaskets and O rings Have the control valve off and apart except the pressure relief valve If I remove it can I just clean it and the valve body and just screw it back in I don't have acess to the "C" adapter to put on the banjo bolt to set it per manual Any advice I hate to clean the rest of the valve and leave one undone I plan on removing and cleaning the directional valve too before adding fluid any input much appreciated as always guys Thanks