Hi everyone,
This is my first fabrication, all comments encouraged as I do not know what I'm doing
The first thing I wanted to tackle was install an electric actuator to operate while in the cab.
Took off the plastic knobs and replaced with 5/16 x 18 locking nuts , they are tightened to allow the chute to operate. Next I decided to drill a 5/16 hole for the top hole, I made sure the bolt head will not hit the stationary part of the chute. stacked about 5 washers on a bolt and temporarily fixed the actuator to the chute. Lol, I cannot figure out how to rotate images.
After measuring the clearance and the washer stacking, I decided to weld a standoff 5/8" long by 5/16 ID to the chute. This gave a max spacing of 1/8th of an inch between the actuator body and the chute.
Lol, hobby welder, standoffs welded and cleaned up.
Actuator mounted, now on to wiring.
This is my first fabrication, all comments encouraged as I do not know what I'm doing
The first thing I wanted to tackle was install an electric actuator to operate while in the cab.

Took off the plastic knobs and replaced with 5/16 x 18 locking nuts , they are tightened to allow the chute to operate. Next I decided to drill a 5/16 hole for the top hole, I made sure the bolt head will not hit the stationary part of the chute. stacked about 5 washers on a bolt and temporarily fixed the actuator to the chute. Lol, I cannot figure out how to rotate images.

After measuring the clearance and the washer stacking, I decided to weld a standoff 5/8" long by 5/16 ID to the chute. This gave a max spacing of 1/8th of an inch between the actuator body and the chute.

Lol, hobby welder, standoffs welded and cleaned up.

Actuator mounted, now on to wiring.