BX 2750D snowblower

eddie

Member
Oct 17, 2009
96
0
6
ottawa ontario
I recently bought a 2750D for my tractor but it hasn't been delivered yet. I'm wondering how long it is going to take me to remove the FEL and add the blower. I will probably do this swap several times during the winter and will eventually get quicker at it, but in the mean time can anyone out there give me an idea on how long it might take the first couple of times, and any tips on using a front blower on an orange tractor. Thanks.
 
Last edited:

SoCal Kubota

New member

Equipment
BX24, BX2750D
Nov 5, 2009
19
0
1
Running Springs, CA.
The first time may take 1 hour. I can do mine in about 15 minutes. The loader comes off in 2 minutes. The PTO drive shaft is the easiest thing to miss up. Make suer it on.