I have a BX25D that has rear hydraulics for the backhoe. Has anyone successfully utilized the existing rear hydraulic connections to drive the top link? I have never tried fabrication of hydraulics but am certainly willing to try. I assume hoses could run to a spool to control the link with lines then run to the top link. Quick connects would seem to be the best set up to make it remove able when I need to reinstall the backhoe. I can weld up a bracket to mount the valve and guide the feed and return lines. Thoughts or guidance?
Last edited: